Skip to content

Manufacturing · 2024

Production line real time data dashboard

An industrial dashboard that collects machine data every second, classifies downtime causes and makes OEE visible.

Client
Industrial production facility
Industry
Manufacturing
Duration
3 wk
Year
2024
Üretim2024 · 3 wk

Industrial production facility

Production line real time data dashboard

  • %100Satisfaction
  • %86Process speed ↑
  • 2.8xConversion

Project summary

What did we solve?

An industrial dashboard that collects machine data every second, classifies downtime causes and makes OEE visible.

Downtime was logged by hand; loss causes were reported by guesswork.

Each sprint ended with a working slice; decisions were made on data, not guesses. The same model can be adapted to your operation.

Audience: Manufacturing teams

Standout capabilities

What made the project strong

Every feature was tied to a measurable business result — a working product, not a showcase.

  • An MQTT collection pipeline was set up

    This step feeds the project’s measurable business result — not a showcase feature.

  • Downtime classification rules were written

    This step feeds the project’s measurable business result — not a showcase feature.

  • Shift-based OEE was automated

    This step feeds the project’s measurable business result — not a showcase feature.

  • Shop-floor screens were deployed

    This step feeds the project’s measurable business result — not a showcase feature.

Starting point

The situation we met

Downtime was logged by hand; loss causes were reported by guesswork.

Approach

The path we took

  1. 01

    An MQTT collection pipeline was set up.

  2. 02

    Downtime classification rules were written.

  3. 03

    Shift-based OEE was automated.

  4. 04

    Shop-floor screens were deployed.

Delivery plan

3 wk clear milestones within

  1. 01

    Discovery

    Stakeholder interviews, current-system review and success metrics.

  2. 02

    Design

    User flows, interface prototype and an approved design system.

  3. 03

    Build

    Iterative software, integrations and security checks.

  4. 04

    Launch

    Go-live, training, metrics dashboard and the first optimisation pass.

Proven results

Project impact in numbers

The work strengthened the sales funnel, operational discipline and executive visibility together. Numbers were watched live; improvements followed a priority matrix.

Satisfaction
%100
Process speed ↑
%86
Conversion
2.8x

Deliverables

  • Discovery brief and success metrics
  • Information architecture and user flows
  • Production-ready software delivery
  • Integration and API documentation
  • Role-based access matrix
  • Handover notes and training

Technologies

  • Next.js
  • MQTT
  • Time-Series DB
  • Grafana

FAQ

Frequently asked questions

How does the process run on this project?+

We run discovery, design, build and launch with clear milestones. Weekly demos and a written scope check keep the client team aligned.

Which problems does this solve in this industry?+

It targets scattered systems, slow decisions and weak visibility — and delivers measurable speed and control.

Is there support after delivery?+

Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. A care pack is available if you want to continue.

Can you adapt a similar project for us?+

Yes. We adapt this industry experience to your process. A 2-hour discovery call locks scope, timeline and investment range.

Related work

Manufacturing more projects in

All projects

Let’s scope this in 2 hours

We will map the bottleneck and leave with a timeline and investment range in the same call.

The next step

Imagine the project —we’ll deliver it!

Fill in the form or write to us directly. We plan a first call and share scope and timeline.

  • 2 hours

    Quote response

  • Fast

    Delivery guarantee

  • 100%

    Satisfaction-led

Monday – Friday, 09:00 – 18:00+90 (850) 242 19 32