Skip to content

Manufacturing · 2024

Warehouse management (WMS) operations panel

Operations software that manages receiving, put-away, picking and shipping on one WMS panel.

Client
Logistics producer facility
Industry
Manufacturing
Duration
3 wk
Year
2024
Üretim2024 · 3 wk

Logistics producer facility

Warehouse management (WMS) operations panel

  • %100Satisfaction
  • %86Process speed ↑
  • 2.8xConversion

Project summary

What did we solve?

Operations software that manages receiving, put-away, picking and shipping on one WMS panel.

Warehouse processes ran in Excel; mis-ships and lost pallets were rising.

Each sprint ended with a working slice; decisions were made on data, not guesses. The same model can be adapted to your operation.

Audience: Manufacturing teams

Standout capabilities

What made the project strong

Every feature was tied to a measurable business result — a working product, not a showcase.

  • Barcoded receiving and slotting were set up

    This step feeds the project’s measurable business result — not a showcase feature.

  • The pick route was optimised

    This step feeds the project’s measurable business result — not a showcase feature.

  • Shipment verification was added

    This step feeds the project’s measurable business result — not a showcase feature.

  • ERP stock integration was completed

    This step feeds the project’s measurable business result — not a showcase feature.

Starting point

The situation we met

Warehouse processes ran in Excel; mis-ships and lost pallets were rising.

Approach

The path we took

  1. 01

    Barcoded receiving and slotting were set up.

  2. 02

    The pick route was optimised.

  3. 03

    Shipment verification was added.

  4. 04

    ERP stock integration was completed.

Delivery plan

3 wk clear milestones within

  1. 01

    Discovery

    Stakeholder interviews, current-system review and success metrics.

  2. 02

    Design

    User flows, interface prototype and an approved design system.

  3. 03

    Build

    Iterative software, integrations and security checks.

  4. 04

    Launch

    Go-live, training, metrics dashboard and the first optimisation pass.

Proven results

Project impact in numbers

The work strengthened the sales funnel, operational discipline and executive visibility together. Numbers were watched live; improvements followed a priority matrix.

Satisfaction
%100
Process speed ↑
%86
Conversion
2.8x

Deliverables

  • Discovery brief and success metrics
  • Information architecture and user flows
  • Production-ready software delivery
  • Integration and API documentation
  • Role-based access matrix
  • Handover notes and training

Technologies

  • Next.js
  • PostgreSQL
  • Barkod
  • ERP API

FAQ

Frequently asked questions

How does the process run on this project?+

We run discovery, design, build and launch with clear milestones. Weekly demos and a written scope check keep the client team aligned.

Which problems does this solve in this industry?+

It targets scattered systems, slow decisions and weak visibility — and delivers measurable speed and control.

Is there support after delivery?+

Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. A care pack is available if you want to continue.

Can you adapt a similar project for us?+

Yes. We adapt this industry experience to your process. A 2-hour discovery call locks scope, timeline and investment range.

Related work

Manufacturing more projects in

All projects

Let’s scope this in 2 hours

We will map the bottleneck and leave with a timeline and investment range in the same call.

The next step

Imagine the project —we’ll deliver it!

Fill in the form or write to us directly. We plan a first call and share scope and timeline.

  • 2 hours

    Quote response

  • Fast

    Delivery guarantee

  • 100%

    Satisfaction-led

Monday – Friday, 09:00 – 18:00+90 (850) 242 19 32