Energy · 2025
Field operations managing enterprise panel
An operations system where 800 field workers manage work orders in real time; it works offline and integrates with ERP.
- Client
- Energy and infrastructure company
- Industry
- Energy
- Duration
- 3 wk
- Year
- 2025
Energy and infrastructure company
Field operations managing enterprise panel
- %96Efficiency gain
- 3.5xGrowth impact
- %100Delivery quality
Project summary
What did we solve?
An operations system where 800 field workers manage work orders in real time; it works offline and integrates with ERP.
Work orders ran on paper and spreadsheets; field data lagged by two days on average.
Each sprint ended with a working slice; decisions were made on data, not guesses. The same model can be adapted to your operation.
Audience: Energy teams
Standout capabilities
What made the project strong
Every feature was tied to a measurable business result — a working product, not a showcase.
An offline-sync mobile interface was developed
This step feeds the project’s measurable business result — not a showcase feature.
A role-based work-order flow was designed
This step feeds the project’s measurable business result — not a showcase feature.
Two-way ERP integration was set up
This step feeds the project’s measurable business result — not a showcase feature.
A live map and status dashboard were added
This step feeds the project’s measurable business result — not a showcase feature.
Starting point
The situation we met
Work orders ran on paper and spreadsheets; field data lagged by two days on average.
Approach
The path we took
- 01
An offline-sync mobile interface was developed.
- 02
A role-based work-order flow was designed.
- 03
Two-way ERP integration was set up.
- 04
A live map and status dashboard were added.
Delivery plan
3 wk clear milestones within
- 01
Discovery
Stakeholder interviews, current-system review and success metrics.
- 02
Design
User flows, interface prototype and an approved design system.
- 03
Build
Iterative software, integrations and security checks.
- 04
Launch
Go-live, training, metrics dashboard and the first optimisation pass.
Proven results
Project impact in numbers
The work strengthened the sales funnel, operational discipline and executive visibility together. Numbers were watched live; improvements followed a priority matrix.
- Efficiency gain
- %96
- Growth impact
- 3.5x
- Delivery quality
- %100
Deliverables
- Discovery brief and success metrics
- Information architecture and user flows
- Production-ready software delivery
- Integration and API documentation
- Role-based access matrix
- Handover notes and training
Technologies
- Next.js
- Node.js
- PostgreSQL
- WebSocket
- SAP
FAQ
Frequently asked questions
How does the process run on this project?+
We run discovery, design, build and launch with clear milestones. Weekly demos and a written scope check keep the client team aligned.
Which problems does this solve in this industry?+
It targets scattered systems, slow decisions and weak visibility — and delivers measurable speed and control.
Is there support after delivery?+
Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. A care pack is available if you want to continue.
Can you adapt a similar project for us?+
Yes. We adapt this industry experience to your process. A 2-hour discovery call locks scope, timeline and investment range.
Related work
Energy more projects in
Smart meter monitoring and alarm platform
A monitoring platform that collects IoT meter data and surfaces anomaly and loss-leakage signals early.
- Efficiency gain
- %98
- Sales impact
- 3.2x
Asset and maintenance management system
A CMMS that manages turbine and transformer maintenance plans, fault history and spare-part stock on one panel.
- Satisfaction
- %100
- Process speed ↑
- %86
Grid outage and notification dashboard
A transparent comms dashboard that maps outage zones and informs subscribers by SMS and app.
- Success rate
- %100
- Time saved
- %82
Let’s scope this in 2 hours
We will map the bottleneck and leave with a timeline and investment range in the same call.