Skip to content

Energy · 2024

Asset and maintenance management system

A CMMS that manages turbine and transformer maintenance plans, fault history and spare-part stock on one panel.

Client
Renewable energy operator
Industry
Energy
Duration
3 wk
Year
2024
Enerji2024 · 3 wk

Renewable energy operator

Asset and maintenance management system

  • %100Satisfaction
  • %86Process speed ↑
  • 2.8xConversion

Project summary

What did we solve?

A CMMS that manages turbine and transformer maintenance plans, fault history and spare-part stock on one panel.

Maintenance records were scattered; repeat faults and spare-part delays were cutting output.

Each sprint ended with a working slice; decisions were made on data, not guesses. The same model can be adapted to your operation.

Audience: Energy teams

Standout capabilities

What made the project strong

Every feature was tied to a measurable business result — a working product, not a showcase.

  • An asset inventory and QR labelling were set up

    This step feeds the project’s measurable business result — not a showcase feature.

  • The preventive-maintenance calendar was automated

    This step feeds the project’s measurable business result — not a showcase feature.

  • Spare-part stock alerts were added

    This step feeds the project’s measurable business result — not a showcase feature.

  • A fault root-cause report was produced

    This step feeds the project’s measurable business result — not a showcase feature.

Starting point

The situation we met

Maintenance records were scattered; repeat faults and spare-part delays were cutting output.

Approach

The path we took

  1. 01

    An asset inventory and QR labelling were set up.

  2. 02

    The preventive-maintenance calendar was automated.

  3. 03

    Spare-part stock alerts were added.

  4. 04

    A fault root-cause report was produced.

Delivery plan

3 wk clear milestones within

  1. 01

    Discovery

    Stakeholder interviews, current-system review and success metrics.

  2. 02

    Design

    User flows, interface prototype and an approved design system.

  3. 03

    Build

    Iterative software, integrations and security checks.

  4. 04

    Launch

    Go-live, training, metrics dashboard and the first optimisation pass.

Proven results

Project impact in numbers

The work strengthened the sales funnel, operational discipline and executive visibility together. Numbers were watched live; improvements followed a priority matrix.

Satisfaction
%100
Process speed ↑
%86
Conversion
2.8x

Deliverables

  • Discovery brief and success metrics
  • Information architecture and user flows
  • Production-ready software delivery
  • Integration and API documentation
  • Role-based access matrix
  • Handover notes and training

Technologies

  • Next.js
  • PostgreSQL
  • QR
  • ERP API

FAQ

Frequently asked questions

How does the process run on this project?+

We run discovery, design, build and launch with clear milestones. Weekly demos and a written scope check keep the client team aligned.

Which problems does this solve in this industry?+

It targets scattered systems, slow decisions and weak visibility — and delivers measurable speed and control.

Is there support after delivery?+

Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. A care pack is available if you want to continue.

Can you adapt a similar project for us?+

Yes. We adapt this industry experience to your process. A 2-hour discovery call locks scope, timeline and investment range.

Related work

Energy more projects in

All projects

Let’s scope this in 2 hours

We will map the bottleneck and leave with a timeline and investment range in the same call.

The next step

Imagine the project —we’ll deliver it!

Fill in the form or write to us directly. We plan a first call and share scope and timeline.

  • 2 hours

    Quote response

  • Fast

    Delivery guarantee

  • 100%

    Satisfaction-led

Monday – Friday, 09:00 – 18:00+90 (850) 242 19 32