Manufacturing · 2023
Production planning and capacity module
A planning module that balances orders, capacity and machine fit; it cut delivery delays.
- Client
- Metal processing factory
- Industry
- Manufacturing
- Duration
- 2 wk
- Year
- 2023
Metal processing factory
Production planning and capacity module
- %99Target hit rate
- %91Ops gain
- 4.9/5Reference score
Project summary
Wetin we solve?
A planning module that balances orders, capacity and machine fit; it cut delivery delays.
Planning was experience-based; bottlenecks were spotted late.
Every sprint end with working slice; decisions follow data, no be guess. The same model fit adapt to your operation.
Audience: Manufacturing teams
Standout capabilities
Wetin make the project strong
Every feature tie to measurable business result — working product, no be showcase.
A capacity model was extracted
This step dey feed the project measurable business result — e no be showcase feature.
An order-priority engine was set up
This step dey feed the project measurable business result — e no be showcase feature.
Bottleneck alerts were added
This step dey feed the project measurable business result — e no be showcase feature.
An executive plan dashboard was delivered
This step dey feed the project measurable business result — e no be showcase feature.
Starting point
The situation we meet
Planning was experience-based; bottlenecks were spotted late.
Approach
The path we take
- 01
A capacity model was extracted.
- 02
An order-priority engine was set up.
- 03
Bottleneck alerts were added.
- 04
An executive plan dashboard was delivered.
Delivery plan
2 wk clear milestones within
- 01
Find-out
Stakeholder interview, current-system review and success metrics.
- 02
Design
User flows, interface prototype and approved design system.
- 03
Build
Iterative software, integrations and security checks.
- 04
Launch
Go-live, training, metrics dashboard and first optimisation pass.
Proven results
Project impact for numbers
The work strengthen sales funnel, operational discipline and executive visibility together. Numbers dey watch live; improvements follow priority matrix.
- Target hit rate
- %99
- Ops gain
- %91
- Reference score
- 4.9/5
Deliverables
- Find-out brief and success metrics
- Information architecture and user flows
- Production-ready software delivery
- Integration and API documentation
- Role-based access matrix
- Handover notes and training
Technologies
- Next.js
- OR-Tools
- PostgreSQL
- ERP
FAQ
Questions people dey ask
How the process dey run for this project?+
We run find-out, design, build and launch with clear milestones. Weekly demo and written scope check keep the client team aligned.
Which problem this one dey solve for this industry?+
E target scattered systems, slow decisions and weak visibility — and e deliver measurable speed and control.
Support dey after delivery?+
Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. Care pack dey if you wan continue.
Una fit adapt similar project for us?+
Yes. We adapt this industry experience to your process. 2-hour find-out call go lock scope, timeline and investment range.
Related work
Manufacturing more projects for
Production line real time data dashboard
An industrial dashboard that collects machine data every second, classifies downtime causes and makes OEE visible.
- Satisfaction
- %100
- Process speed ↑
- %86
Digital quality control app
A quality app that digitises checklists, photo evidence and nonconformity tracking.
- Success rate
- %100
- Time saved
- %82
Warehouse management (WMS) operations panel
Operations software that manages receiving, put-away, picking and shipping on one WMS panel.
- Satisfaction
- %100
- Process speed ↑
- %86
Make we scope this for 2 hours
We go map the bottleneck and leave with timeline and investment range for the same call.