Skip go di content

Energy · 2024

Asset and maintenance management system

A CMMS that manages turbine and transformer maintenance plans, fault history and spare-part stock on one panel.

Client
Renewable energy operator
Industry
Energy
Duration
3 wk
Year
2024
Enerji2024 · 3 wk

Renewable energy operator

Asset and maintenance management system

  • %100Satisfaction
  • %86Process speed ↑
  • 2.8xConversion

Project summary

Wetin we solve?

A CMMS that manages turbine and transformer maintenance plans, fault history and spare-part stock on one panel.

Maintenance records were scattered; repeat faults and spare-part delays were cutting output.

Every sprint end with working slice; decisions follow data, no be guess. The same model fit adapt to your operation.

Audience: Energy teams

Standout capabilities

Wetin make the project strong

Every feature tie to measurable business result — working product, no be showcase.

  • An asset inventory and QR labelling were set up

    This step dey feed the project measurable business result — e no be showcase feature.

  • The preventive-maintenance calendar was automated

    This step dey feed the project measurable business result — e no be showcase feature.

  • Spare-part stock alerts were added

    This step dey feed the project measurable business result — e no be showcase feature.

  • A fault root-cause report was produced

    This step dey feed the project measurable business result — e no be showcase feature.

Starting point

The situation we meet

Maintenance records were scattered; repeat faults and spare-part delays were cutting output.

Approach

The path we take

  1. 01

    An asset inventory and QR labelling were set up.

  2. 02

    The preventive-maintenance calendar was automated.

  3. 03

    Spare-part stock alerts were added.

  4. 04

    A fault root-cause report was produced.

Delivery plan

3 wk clear milestones within

  1. 01

    Find-out

    Stakeholder interview, current-system review and success metrics.

  2. 02

    Design

    User flows, interface prototype and approved design system.

  3. 03

    Build

    Iterative software, integrations and security checks.

  4. 04

    Launch

    Go-live, training, metrics dashboard and first optimisation pass.

Proven results

Project impact for numbers

The work strengthen sales funnel, operational discipline and executive visibility together. Numbers dey watch live; improvements follow priority matrix.

Satisfaction
%100
Process speed ↑
%86
Conversion
2.8x

Deliverables

  • Find-out brief and success metrics
  • Information architecture and user flows
  • Production-ready software delivery
  • Integration and API documentation
  • Role-based access matrix
  • Handover notes and training

Technologies

  • Next.js
  • PostgreSQL
  • QR
  • ERP API

FAQ

Questions people dey ask

How the process dey run for this project?+

We run find-out, design, build and launch with clear milestones. Weekly demo and written scope check keep the client team aligned.

Which problem this one dey solve for this industry?+

E target scattered systems, slow decisions and weak visibility — and e deliver measurable speed and control.

Support dey after delivery?+

Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. Care pack dey if you wan continue.

Una fit adapt similar project for us?+

Yes. We adapt this industry experience to your process. 2-hour find-out call go lock scope, timeline and investment range.

Related work

Energy more projects for

All projects

Make we scope this for 2 hours

We go map the bottleneck and leave with timeline and investment range for the same call.

Di next step

Imagine di project —we go deliver am!

Fill di form or write us direct. We go plan first call and share scope and timeline.

  • 2 hours

    Quote response

  • Fast

    Delivery guarantee

  • 100%

    Satisfaction-led

Monday – Friday, 09:00 – 18:00+90 (850) 242 19 32