ייצור · 2024
Production line real time data dashboard
An industrial dashboard that collects machine data every second, classifies downtime causes and makes OEE visible.
- לקוח
- Industrial production facility
- ענף
- ייצור
- משך
- 3 wk
- שנה
- 2024
Industrial production facility
Production line real time data dashboard
- %100Satisfaction
- %86Process speed ↑
- 2.8xConversion
סיכום הפרויקט
מה פתרנו?
An industrial dashboard that collects machine data every second, classifies downtime causes and makes OEE visible.
Downtime was logged by hand; loss causes were reported by guesswork.
Each sprint ended with a working slice; decisions were made on data, not guesses. The same model can be adapted to your operation.
קהל יעד: ייצור teams
יכולות בולטות
מה חיזק את הפרויקט
כל יכולת נקשרה לתוצאת עסק מדידה — מוצר שעובד, לא תצוגה.
An MQTT collection pipeline was set up
This step feeds the project’s measurable business result — not a showcase feature.
Downtime classification rules were written
This step feeds the project’s measurable business result — not a showcase feature.
Shift-based OEE was automated
This step feeds the project’s measurable business result — not a showcase feature.
Shop-floor screens were deployed
This step feeds the project’s measurable business result — not a showcase feature.
נקודת התחלה
המצב שפגשנו
Downtime was logged by hand; loss causes were reported by guesswork.
גישה
הדרך שלקחנו
- 01
An MQTT collection pipeline was set up.
- 02
Downtime classification rules were written.
- 03
Shift-based OEE was automated.
- 04
Shop-floor screens were deployed.
תוכנית מסירה
3 wk אבני דרך ברורות בתוך
- 01
Discovery
Stakeholder interviews, current-system review and success metrics.
- 02
Design
User flows, interface prototype and an approved design system.
- 03
Build
Iterative software, integrations and security checks.
- 04
Launch
Go-live, training, metrics dashboard and the first optimisation pass.
תוצאות מוכחות
השפעת הפרויקט במספרים
The work strengthened the sales funnel, operational discipline and executive visibility together. Numbers were watched live; improvements followed a priority matrix.
- Satisfaction
- %100
- Process speed ↑
- %86
- Conversion
- 2.8x
מה נמסר
- Discovery brief and success metrics
- Information architecture and user flows
- Production-ready software delivery
- Integration and API documentation
- Role-based access matrix
- Handover notes and training
טכנולוגיות
- Next.js
- MQTT
- Time-Series DB
- Grafana
שאלות
שאלות נפוצות
How does the process run on this project?+
We run discovery, design, build and launch with clear milestones. Weekly demos and a written scope check keep the client team aligned.
Which problems does this solve in this industry?+
It targets scattered systems, slow decisions and weak visibility — and delivers measurable speed and control.
Is there support after delivery?+
Yes. After launch we monitor, fix issues and run priority improvement rounds against sales and operations metrics. A care pack is available if you want to continue.
Can you adapt a similar project for us?+
Yes. We adapt this industry experience to your process. A 2-hour discovery call locks scope, timeline and investment range.
עבודות קשורות
ייצור עוד פרויקטים בענף
Digital quality control app
A quality app that digitises checklists, photo evidence and nonconformity tracking.
- Success rate
- %100
- Time saved
- %82
Warehouse management (WMS) operations panel
Operations software that manages receiving, put-away, picking and shipping on one WMS panel.
- Satisfaction
- %100
- Process speed ↑
- %86
Production planning and capacity module
A planning module that balances orders, capacity and machine fit; it cut delivery delays.
- Target hit rate
- %99
- Ops gain
- %91
Let’s scope this in 2 hours
We will map the bottleneck and leave with a timeline and investment range in the same call.